Large-gradient Tunneling Picks: Selection & Maintenance | Field Practical Guide

No redundant theories, only hands-on practices. For inclined coal roadways and steep-slope tunnels, proper pick selection and maintenance can slash your consumable costs by half.

1. Why do picks fail rapidly in steep-gradient tunneling?

Large-gradient working conditions differ drastically from normal horizontal roadways. Once the machine tilts, the force distribution changes completely. Picks are subjected to eccentric impact loads; coal and rock slide down naturally, bringing extra dragging load. Poor muck removal on steep slopes leads to gangue accumulation covering pick tips, and unilateral eccentric wear becomes a common issue.

Poor equipment stability and severe high-frequency vibration frequently cause circlip loosening, pick shank fracture and tungsten carbide tip chipping. Moreover, steep roadways usually contain plenty of partings and interlaced faults with frequent alternation of soft and hard rock layers. Standard picks cannot withstand such alternating loads.

Key conclusion: Pick failure is not always caused by poor product quality. It arises when working conditions change while pick selection and maintenance fail to adapt accordingly.

2. Pick Selection Based on Working Conditions – Not the most expensive, but the most suitable

Simple rule of thumb: Flat-tipped picks for soft rock, pointed picks for hard rock, composite picks for complex strata.

3. Three Daily Maintenance Steps to Greatly Extend Pick Service Life

Pick durability relies 70% on operation and 30% on maintenance. Spending ten minutes daily on these steps saves far more cost than frequently replacing new picks.

✅ Pre-shift inspection (preventive maintenance) Check the fastening status of each pick, tighten any loose ones. Immediately replace picks with over 50% wear or chipping; do not delay. Thoroughly clear accumulated gangue on pick holders to avoid cascading damage from eccentric force.

✅ Standard operation (reduce unnecessary wear) Slow down actively when encountering hard rock or faults; avoid forced cutting. Timely remove piled gangue on the working face to prevent dry friction of picks.

✅ Post-shift cleaning (prolong component service life) Clean picks and drum surface; inspect whether circlips and seals are aging. Mandatory replacement when the remaining height of carbide tips drops below 1/3 of the original height. Otherwise, cutting efficiency declines sharply, and pick holder damage is highly likely, pushing up maintenance costs.

4. Quick Troubleshooting for Common Failures

Closing Remarks

Excessive pick consumption in large-gradient tunneling is a widespread industry problem. There is no universal “one-size-fits-all” pick. Instead, you need dynamic selection solutions tailored to site conditions. Keep this in mind: labor cost for pick replacement plus production downtime losses often far exceed the price of a single pick. Never fall into the cost trap of penny wise and pound foolish in steep-slope tunneling.

If you have doubts about pick selection on-site, or encounter abnormal eccentric wear and pick breakage, feel free to send photos and parameters of your working conditions for joint discussion.

📩 Contact channel available. We respond to all inquiries and share full technical insights.