Rising alloy prices are an inevitable trend; professional construction process services hold the key to cost reduction

Since 2025, the alloy market has witnessed an unstoppable wave of price increases, which has quickly swept the entire industrial chain, bringing considerable cost pressure to engineering fields such as mining and tunneling. Among them, the prices of key alloy raw materials for manufacturing cutting teeth, such as tungsten powder, nickel, molybdenum, and cobalt, have been continuously rising and remaining high, directly leading to a significant increase in the procurement and use costs of cutting teeth in mining, tunnel boring and other operations. Faced with this irreversible trend of price increases, if enterprises simply rely on raising prices to pass on cost pressures, they will not only easily lose market competitiveness and fall into the dilemma of order loss, but also find it difficult to achieve long-term sustainable development. Therefore, relying on professional construction method services to accurately match the optimal plan for different working conditions is the core key for enterprises to break through cost bottlenecks and achieve cost reduction and efficiency improvement.

The Rise in Alloy Prices is Not a Short-Term Fluctuation, but an Inevitable Long-Term Trend

Many enterprises mistakenly believe that the current alloy price increase is a short-term market fluctuation and hold a fluke mentality of waiting for prices to callback. In fact, the alloy price increase is not accidental, but an inevitable result of the long-term superposition of multiple factors such as supply-demand imbalance, policy regulation, and resource constraints. On the supply side, the global reserves of alloy mineral resources are limited and unevenly distributed. At the same time, the control over mineral development at home and abroad is becoming increasingly strict, and environmental protection and compliance requirements are constantly improving, directly leading to a continuous contraction in the supply of alloy raw materials, which is difficult to meet market demand. On the demand side, the rigid demand in domestic mining, infrastructure construction and other fields is surging, and the concentrated start of large-scale projects has further expanded the supply-demand gap of alloy raw materials. This pattern is difficult to change in the short term, and alloy prices will remain high for a long time, forcing enterprises to shift from “passive pressure bearing” to “active cost reduction” in order to gain a firm foothold in the industry.

Differentiated Responses: Misaligned Strategies Waste Costs, Leading Enterprises Have Solutions

Faced with the cost pressure brought by the rise in alloy prices, different enterprises have obvious differences in their response strategies, and the final operating results are vastly different. Some enterprises adopt a simple and rude price increase transmission model, trying to pass all the increased costs to the downstream. Although this can alleviate the pressure in the short term, it will greatly weaken their own competitiveness and eventually fall into a vicious circle of “price increase – order loss – further price increase”. Other enterprises passively wait for price callbacks and do not make any cost optimization, leading to high cutting tooth loss rates, continuous accumulation of costs, and declining profitability. In sharp contrast, leading enterprises in the industry have long insight into the market trend, taken professional construction method services as their core cost reduction strategy, and through personalized working condition adaptation plans, they have not only effectively digested cost pressures, but also improved operational efficiency and service quality, further consolidating their market competitiveness.

Core of Cost Reduction by Construction Methods: Precise Adaptation, Not Process Adjustment

The core of construction method services is that a professional technical team goes deep into the operation site to comprehensively survey working condition information such as rock hardness, operating environment, and equipment model, and customizes exclusive drill arrangement and cutting tooth selection plans based on actual conditions, so as to maximize the efficiency of existing equipment and reduce losses and costs from the root. Compared with traditional general schemes, construction method services have clear paths, strong implementability, and quick results. They do not require enterprises to invest a lot of funds in equipment modification or change existing operation processes, and are the core and feasible starting point for hedging against alloy price increases and achieving cost reduction and efficiency improvement.

Three Paths to Implement Cost Reduction by Construction Methods

1. Optimize Cutting Tooth Arrangement: Reduce Losses from the Source

Optimizing cutting tooth arrangement is the primary path for cost reduction by construction methods, with the core of reducing cutting tooth losses from the source. Professional construction method teams comprehensively grasp rock hardness, wear resistance and equipment operation parameters through on-site testing and data collection, and scientifically optimize the spacing, angle and arrangement of cutting teeth to avoid mutual interference and uneven force between cutting teeth, thereby reducing unnecessary losses. For example, in a hard rock mine in Yunnan, the single-shift cutting tooth loss was 12 pieces before optimization, and it was reduced to 3 pieces after optimization, with a loss rate dropping by 75%; in the Xiamen New Airport Tunnel Project, only adjusting the cutting tooth arrangement saved nearly one million yuan in alloy costs, achieving a significant cost reduction effect.

2. Precise Cutting Tooth Selection: Eliminate Resource Waste

Precise cutting tooth selection is the key to eliminating resource waste and achieving cost reduction, breaking the unreasonable model of “one general cutting tooth for all scenarios”. Different operation scenarios and rock hardness have different requirements for the material, model and specification of cutting teeth. Blindly using general cutting teeth will not only accelerate cutting tooth loss and affect operation efficiency, but also cause serious waste of alloy resources. The construction method team accurately matches suitable cutting teeth according to on-site rock hardness, abrasiveness and equipment parameters, achieving a win-win situation of cost reduction and efficiency improvement. For example, in a hard rock coal mine in Guizhou, the cutting tooth consumption per meter of tunneling was 8 pieces before adaptation, and it was reduced to 1 piece after adaptation, saving more than one million yuan in alloy costs annually.

3. Full-Process Operation and Maintenance: Plug Cost Leaks

Full-process operation and maintenance is an important guarantee for plugging cost leaks and achieving cost control. Many enterprises ignore this link, leading to the long-term accumulation of minor losses and huge waste. It should be noted that alloy costs account for more than 70% of the total cost of cutting teeth. Even a slight loss of a single cutting tooth will form a considerable expenditure in the long run. Construction method services are not a one-time plan, but a full-process service throughout the operation. The team will real-time monitor cutting tooth loss, dynamically adjust the plan according to changes in working conditions, timely solve loss hidden dangers, ensure that the loss rate remains at a low level, keep alloy costs accurately controllable, and achieve cost reduction and efficiency improvement from details.