In various construction scenarios such as pile foundations, mines, and tunnels, poor slag discharge is one of the most troublesome problems for bosses. Poor slag discharge can cause accumulation of slag and rock, reduce construction efficiency, increase pick wear, and increase consumable costs; in severe cases, it may cause accidents such as stuck drill, stuck drill, buried drill, etc., which will lead to multiple losses such as equipment shutdown, construction delay, maintenance and compensation.
Many construction bosses choose to replace picks frequently, but they still encounter slag blockage repeatedly. Ultimately, the crux of poor slag discharge is rarely due to the quality of the picks, but the root cause is a serious mismatch between construction methods and working conditions. Selecting the right pick is just the ticket. Only by allowing professional construction methods to accurately adapt to the formation is the key to completely ending the problem of slag discharge.

Thoroughly understand the three major causes of repeated slag removal problems
1. The construction method does not match the ground conditions
During the construction process, no targeted slag discharge plan was formulated based on the actual stratigraphic characteristics of the site. General construction methods were used for different strata—such as shallow soft soil layers, clay strata, hard rock layers, and mixed complex strata. This approach can easily lead to problems such as clay coating the drilling tool, accumulation and blockage of slag and rock, and obstruction of the slag discharge channel, which fundamentally leads to failure of slag discharge.
2. Unreasonable pick selection and drilling tool tooth arrangement design
No attention is paid to the selection of picks, and the angle, number, and spacing of the rows of teeth do not meet the actual construction conditions, resulting in poor rock crushing effect, different sizes of slag particles produced, and significantly increased drilling resistance. During the construction process, phenomena such as sticky drilling, idling of equipment, and incomplete rock mass crushing frequently occurred, and the slag discharge efficiency continued to decline.
3. Lack of full-process standardized construction method guidance
The on-site control of drilling speed, pressurization method and operating rhythm failed to coordinate with the performance of the pick and the bearing capacity of the formation, making it difficult to play the core role of the pick in breaking rocks and assisting in slag discharge. The construction mostly relies on experience, the operation is not standardized, and the parameters are not optimized, resulting in low slag discharge efficiency and increased pick loss.
Mailinmat’s full-process construction method service: solving the pain points of slag discharge from the root

We always adhere to working conditions as the core and actual results as the goal, providing full-process construction method services from preliminary survey, plan customization to on-site implementation and long-term after-sales, to accurately solve various construction problems.
01 Precise investigation in the early stage to identify the core issues
Professional technicians will conduct on-site surveys to accurately collect on-site stratigraphic parameters, equipment models, on-site construction and slag blocking conditions, tooth consumption and other issues. Combined with many years of practical experience, we can accurately locate the core reasons for poor slag discharge.
02 Customize exclusive solutions to improve quality, efficiency and reduce consumption
Relying on on-site working conditions, we accurately match the appropriate pick models, scientifically optimize the angle and spacing of the teeth, and reduce drilling resistance; we formulate standardized drilling, pressurization, and slag discharge operation plans to achieve simultaneous and efficient advancement of rock crushing and slag discharge, and solve problems such as slag blocking, drilling paste, and slow progress from the technological level.
03 On-site implementation guidance and long-term after-sales guarantee

Technical personnel are on-site to guide the entire process of pick installation, equipment debugging, and parameter optimization, and fine-tune the details of the construction method in real time based on the construction status to ensure that the plan is effective. At the same time, regular visits are made to review the construction results.
Customer case
Feedback from Mr. Li of an infrastructure project in Xinjiang: “I have replaced picks from several companies before, but the problems of slag blocking and tooth wear have not been solved, and the construction period is often delayed. After using your customized construction method service, the on-site slag discharge process was smooth, the loss of picks was directly reduced by 30%, and the construction efficiency was greatly improved.”
Conclusion
To solve the problem of construction slag removal, reliable picks are the foundation, and scientifically adapted construction methods are the core. If your construction site is facing the problem of poor slag discharge, welcome to contact Mailinmat. We will optimize the strata, equipment, and processes from all dimensions to help the construction party say goodbye to the trouble of slag discharge and truly achieve quality improvement, efficiency increase, cost reduction, and safety!